Investigation and efficiency analysis: 405 km transmission line with series compensation

Access full-text article here

Tags:

Peer-Reviewed Research
  • SDG 7
  • Abstract:

    This article presents an investigative case study and efficiency analysis of the 405 km, 420 kV transmission line between Insukamini substation in Bulawayo, Zimbabwe and the Matimba thermal power station in South Africa (which is routed through Botswana)